Prepare industry-specific activities, review readiness, link controlled HSE records and independently verify closure.
Your industry workflow
- An organization administrator enables the industry workspace and assigns coordinator, activity owner and independent reviewer roles with unit scopes.
- Choose the activity type. Add its location, responsible owner, dates, internal/contractor/mixed workforce and industry-specific details.
- Complete every readiness check. Explain failed or not-applicable answers, resolve failures, attach evidence and link HSE source records.
- Submit for review. A reviewer independent of the creator and owner approves it; supporting evidence must pass scanning.
- Start within the approved date window. Where required, the linked PTW must already be active. Complete work, attach evidence and request verification.
- An independent reviewer verifies closure after linked PTW/CAPA are resolved. Recurrence creates a fresh draft; it never copies approval.
Add and Edit use popup forms. Detail contains checks, evidence, linked records, workflow and history. Search and exports respect all selected filters and your access scope.
Activity relationships & work controls
Open Work controls beside an activity. The matrix explains each control, shows its linked record and current status, and distinguishes direct links from dependencies reached through a Work Package or PTW. Link saved records from the same unit; typing a reference does not create a relationship. The next-step banner shows the checks that also run when you submit the workflow change.
When required, a directly linked active PTW within its validity window is mandatory to start. Directly linked PTW/CAPA must be resolved before closure. Other controls retain their source approval and release processes. Activity approval never approves a Work Package, verifies LOTO or activates a permit. Reopen Detail to refresh source status.
HSE modules in the top menu
The menu above the hero groups related pages under Planning, Risk & permits, Resources, Operations, Monitoring & response, Assurance & reports, and Help & workspaces. Select a group or its down arrow to reveal related submenus on desktop or mobile. Overview stays directly accessible. The current group is highlighted; press Escape or click outside to close a list. Equipment opens with your industry filter; Facilities keeps the selected facility. Each source module continues to use its own records, permissions and package access.
Enable or disable additional workspaces
Open Industry workspaces. An organization administrator can disable an additional workspace after confirming the popup. The default workspace cannot be disabled. Disabling hides its menu and pauses workspace access and scheduled jobs, while keeping records, evidence and history. Select Enable workspace to restore it. Shared HSE records remain in their source modules.
Construction & Infrastructure
Project & site readiness
Capture: Project reference · Principal contractor · Construction phase · Site layout / emergency plan · Next site review
- Site boundaries and public segregation confirmed
- Emergency access and assembly points checked
- Induction and workforce competency reviewed
- Current risk assessments and inspection programme reviewed
Lifting operation review
Capture: Lift plan reference · Load (tonnes) · Crane / lifting equipment reference · Planned lift radius (m) · Ground bearing verification
- Lift plan and competent lifting team checked
- Equipment and lifting gear certification checked
- Ground condition and exclusion zone verified
- Weather limits and communication agreed
An active linked PTW is required before this activity starts.
Scaffold & temporary works
Capture: Design / scaffold reference · Working height (m) · Inspection / handover reference · Handover date · Design load class
- Design and load limits reviewed
- Competent inspection and handover checked
- Access, edge protection and ties checked
- Alterations and reinspection controls agreed
Excavation readiness
Capture: Excavation area / drawing · Planned depth (m) · Underground utility survey · Ground support / batter method · Inspection frequency and triggers
- Utilities identified and isolated where required
- Ground support and collapse controls reviewed
- Access, water ingress and atmosphere considered
- Barricades and daily inspection assigned
An active linked PTW is required before this activity starts.
Work at height
Capture: Task / method statement · Working height (m) · Rescue plan reference · Access method · Anchor / collective protection reference
- Collective protection selected where practicable
- Access equipment and anchor suitability checked
- Competency, harness and rescue readiness checked
- Falling objects and weather controls checked
An active linked PTW is required before this activity starts.
Site handover & assurance
Capture: Handover reference · Handover boundary · Receiving party · Residual risks and limitations · Outstanding defects reference
- Outstanding defects and CAPA reconciled
- Retained inspection and test evidence checked
- Temporary works and utilities made safe
- Receiving party briefed on residual risks
Demolition & structural alteration
Capture: Structure / survey reference · Engineered demolition sequence · Utility disconnection reference · Hazardous material survey and disposition · Exclusion boundary and public protection · Structural stability review reference
- Structural survey and sequence accepted by responsible competent persons
- Services and stored energy isolated and verified
- Hazardous materials assessed before disturbance
- Collapse and debris zones segregated from workers and public
- Dust, noise and vibration controls and monitoring agreed
- Stop-work triggers, rescue and emergency access briefed
An active linked PTW is required before this activity starts.
Site traffic & public interface
Capture: Traffic management plan reference · Delivery / diversion window · Vehicle route and reversing locations · Protected pedestrian route · Traffic controller / banksman · Road authority consent reference or applicability reason
- Routes and turning areas checked against vehicle size
- Public and workforce pedestrian routes segregated
- Delivery timing and traffic controllers confirmed
- Diversion signs, lighting and barriers inspected
- Road authority requirements reviewed where applicable
- Emergency access maintained throughout the work
Formwork & concrete pour release
Capture: Pour / structural element reference · Formwork and falsework design reference · Planned volume (m³) · Pour sequence and rate control · Pre-pour inspection reference · Responsible release authority
- Design, load assumptions and support conditions reviewed
- Formwork inspection and release recorded
- Pump positioning, outriggers and exclusion zones checked
- Access, edge protection and hose handling reviewed
- Pour sequence, monitoring and stop criteria briefed
- Striking and back-propping subject to separate authorized release
Scaffolding erection & handover
Capture: Scaffold design / configuration · Loading class and access · Inspection / handover tag reference
- Design, foundation and ties checked
- Competent erection team and exclusion zone confirmed
- Platforms, edge protection and safe access verified
- Inspection tag and reinspection after changes recorded
An active linked PTW is required before this activity starts.
Electrical installation & isolation
Capture: Circuit / supply boundary · Isolation and test reference · Authorized electrical person
- Supply sources and stored energy identified
- Isolation and absence of voltage verified by competent person
- Tools, barriers and emergency arrangements checked
- Re-energization and handback authorization agreed
An active linked PTW is required before this activity starts.
Hot work & fire prevention
Capture: Method and work boundary · Fire watch and post-work watch · Combustible removal / protection
- Ignition, fuel and adjacent areas assessed
- Permit, gas test where required and fire watch verified
- Fire protection and emergency access confirmed
- Post-work monitoring and handback recorded
An active linked PTW is required before this activity starts.
Confined space entry
Capture: Space register / classification reference · Authorized entry team and standby person · Site-specific rescue plan reference
- Entry assessment, isolation and ventilation verified
- Current atmosphere testing and monitoring confirmed
- Authorized entrants, standby and communication checked
- Rescue team, equipment and response arrangements verified
An active linked PTW is required before this activity starts.
Heavy plant & machinery movement
Capture: Equipment and operator references · Ground bearing / travel route · Spotter and exclusion plan
- Equipment inspection and operator competence confirmed
- Ground, gradients and overhead services assessed
- Pedestrian separation and reversing controls checked
- Parking, refuelling and emergency arrangements agreed
Roofing & facade installation
Capture: Fragile roof / open edge plan · Access equipment / anchorage reference · Approved weather and wind limits
- Load-bearing surfaces and anchorages verified
- Fall prevention and dropped-object protection installed
- Lifting, weather and public interfaces coordinated
- Rescue method briefed and equipment available
An active linked PTW is required before this activity starts.
MEP installation & commissioning
Capture: System and commissioning boundary · Pressure / functional test method · Trade interfaces and energization plan
- Approved method and installation sequence reviewed
- Isolation, stored energy and test boundaries verified
- Concurrent trades, access and lifting coordinated
- Test records and safe handback arrangements confirmed
An active linked PTW is required before this activity starts.
Construction chemicals & exposure
Capture: Chemical inventory / SDS reference · Exposure routes and persons at risk · Storage, spill and waste arrangements
- Current SDS and task exposure assessment reviewed
- Substitution, ventilation and handling controls checked
- Training, protection and required monitoring confirmed
- Spill response, storage compatibility and waste route agreed
Manufacturing & Engineering
Production line readiness
Capture: Line / process reference · Product family · Operating shift · Pre-start checklist reference · Operators in shift
- Machine guards and interlocks checked
- Operators trained for current tasks
- Material handling and pedestrian routes clear
- Emergency stops and response arrangements checked
Machine / process change
Capture: Machine reference · Change control reference · Change scope · Trial and acceptance results · Source MOC reference
- Risk assessment reflects the change
- Guarding and control logic validated
- Procedures and training updated
- Trial, acceptance and residual risks recorded
Maintenance & isolation
Capture: Asset reference · Isolation / LOTO reference · Energy sources · Zero-energy verification method · Restoration owner
- All energy sources identified
- Authorized isolation and zero-energy verification checked
- Maintenance work party and tools ready
- Restoration and restart responsibility agreed
An active linked PTW is required before this activity starts.
Chemical process handling
Capture: Process reference · Chemical inventory / SDS reference · Exposure assessment reference · Containment / ventilation reference · Waste disposal route
- Current SDS and compatibility reviewed
- Ventilation and containment checked
- Exposure controls and PPE suitable
- Spill response and waste route confirmed
Occupational hygiene review
Capture: Exposure being reviewed · Exposed workgroup · Assessment / monitoring reference · Monitoring date · Control follow-up
- Sampling scope and competent assessor confirmed
- Instrument calibration and methods reviewed
- Results referred to occupational health controls
- Follow-up owners and review dates assigned
Factory shutdown / restart
Capture: Shutdown reference · Plant / line boundary · Restart authority · Pre-start review reference · Outstanding restart restrictions
- Work packages and simultaneous tasks coordinated
- Isolation and contractor interfaces agreed
- Outstanding defects and permits reconciled
- Pre-start checks and authorized release complete
An active linked PTW is required before this activity starts.
Machine guarding & interlock review
Capture: Equipment reference · Dangerous movement / access zone · Guard / protective device type · Approved test procedure reference · Test outcome and defects · Isolation or authorized release reference
- All operating, setup and cleaning access considered
- Guards and protective devices inspected for tampering or damage
- Testing performed under an approved safe method
- Emergency stopping and restart behavior reviewed
- Defects isolated and linked to corrective action
- Authorized return-to-service recorded in Equipment
Pressure system examination review
Capture: Pressure equipment reference · Design pressure (bar) · Operating pressure (bar) · Competent examination / certificate reference · Relief device and test reference · Next review date
- Equipment identity and applicable examination scope confirmed
- Operating envelope and protective devices reviewed
- Isolation, depressurization and stored energy controls agreed
- Deficiencies assessed by responsible competent persons
- Certificate retained once in the Equipment source
- Review date and corrective action ownership assigned
Combustible dust control review
Capture: Dust-producing material · Process / extraction system reference · Dust hazard assessment reference · Ignition sources and controls · Approved housekeeping method · Explosion protection / isolation design reference
- Material characteristics reviewed with competent support
- Accumulation and concealed dust locations assessed
- Extraction and containment checked against design
- Ignition sources and static controls addressed
- Cleaning method avoids dispersing dust clouds
- Protection defects and changes routed to source CAPA / MOC
Oil, Gas & Petrochemicals
Process area readiness
Capture: Process area / unit · Operating mode · Shift handover reference · Operating envelope reference · Outstanding shift actions
- Operating envelope and hazards reviewed
- Safety-critical equipment status checked
- Emergency response and access confirmed
- Shift handover and outstanding actions reviewed
SIMOPS coordination
Capture: SIMOPS matrix reference · Interacting activities · Area authority · Conflicts and agreed sequencing · Coordination meeting reference
- Conflicting activities and boundaries assessed
- Permit and isolations interfaces coordinated
- Communication and stop-work authority agreed
- Emergency scenarios and escape routes reviewed
An active linked PTW is required before this activity starts.
Process isolation review
Capture: Isolation certificate / plan · System boundary · Verification method · Blind / isolation point list · Reinstatement sequence
- All process and energy sources identified
- Isolation scheme independently reviewed
- Draining, venting and gas testing considered
- Reinstatement sequence and authority agreed
An active linked PTW is required before this activity starts.
Turnaround / shutdown readiness
Capture: Turnaround reference · Scope boundary · Contractor interfaces · Commissioning / restart reference · Critical path interfaces
- Work packages and critical path hazards reviewed
- Competency, staffing and fatigue controls checked
- Permits, isolations and SIMOPS coordinated
- Commissioning and restart checks assigned
An active linked PTW is required before this activity starts.
Product transfer operation
Capture: Product / SDS reference · Transfer route / connection · Receiving system · Receiving capacity verification · Emergency shutdown test reference
- Compatibility, capacity and connection verified
- Containment and ignition controls checked
- Communication and emergency shutdown agreed
- Spill response and transfer monitoring assigned
Safety barrier assurance
Capture: Barrier / safeguard reference · Performance standard reference · Impairment / test reference · Next planned test · Open impairments
- Barrier condition and test evidence reviewed
- Impairments and compensating controls recorded
- Owners and restoration dates assigned
- Independent acceptance and communication checked
Pre-startup safety review (PSSR)
Capture: New / modified system reference · Source MOC / project reference · Design and construction acceptance reference · Outstanding actions and startup restrictions · Operating / emergency procedure revisions · Accountable startup authority
- Construction and equipment verified against approved design
- Risk review actions and startup blockers resolved
- Operating, maintenance and emergency procedures ready
- Operating team competency and handover confirmed
- Safeguard tests and isolation reconciliation completed
- Startup release follows the source MOC and operating authorization
Barrier impairment & restoration
Capture: Safety-critical barrier reference · Impairment and affected scenarios · Compensating controls and monitoring · Temporary impairment authorization reference · Restoration review date · Restoration test / acceptance reference
- Affected hazards and dependencies evaluated
- Temporary risk controls independently reviewed
- Operating restrictions communicated to all shifts
- Restoration deadline and responsible owner assigned
- Any extension follows a fresh authorized risk review
- Restoration test and source record release verified
Loss-of-containment follow-up
Capture: Source event reference · Equipment / line reference · Released material · Isolation and containment response · Environmental monitoring / notification reference · Repair and reinstatement review reference
- Event captured in the source event register
- Immediate protection and isolation verified
- Potential environmental and public impacts assessed
- Investigation and corrective actions linked to sources
- Repair integrity and pre-start requirements reviewed
- Notifications and authorized reinstatement evidence retained
Logistics, Warehousing & Distribution
Loading bay & dispatch
Capture: Bay reference · Load type · Vehicle / trailer reference · Restraint / load check reference · Dispatch authority
- Vehicle immobilization and dock interface checked
- Pedestrian separation and reversing controls checked
- Load stability and restraint verified
- Driver briefing and departure checks complete
Forklift & traffic zone
Capture: Traffic zone · Forklift / truck reference · Operator competency reference · Pedestrian segregation controls · Pre-use check reference
- Pre-use checks completed
- Authorized operator and load limits checked
- Pedestrians and crossings protected
- Charging / refuelling area controlled
Racking & storage inspection
Capture: Rack / aisle reference · Displayed safe load (kg) · Inspection reference · Damage / isolation reference · Next inspection
- Damage, anchors and bracing checked
- Loads and pallets within approved limits
- Aisles and fire protection clear
- Damaged bays isolated and follow-up assigned
Cold storage work safety
Capture: Cold room reference · Operating temperature (°C) · Refrigerant / SDS reference · Entrapment alarm test reference · Cold exposure work / rest plan
- Entrapment release and alarms checked
- Cold exposure and work duration controlled
- Refrigerant leak response reviewed
- Floors, ice and manual handling controlled
Journey & delivery risk
Capture: Route / destination · Vehicle reference · Planned journey (hours) · Check-in and safe-stop plan · Load / restraint check reference
- Driver readiness and rest arrangements checked
- Vehicle roadworthiness and load checked
- Route, weather and delivery hazards reviewed
- Communication and emergency contacts confirmed
Warehouse safety walk
Capture: Inspection zone · Shift · Walk / checklist reference · Findings and immediate controls · Source CAPA reference
- Housekeeping and walkways clear
- Storage and hazardous goods segregated
- Fire exits and emergency equipment accessible
- Findings assigned to responsible owners
Dangerous goods handling & segregation
Capture: Consignment / storage reference · Dangerous goods classification / UN reference · Quantity and unit · Compatibility and segregation plan · Packaging / transport document reference · Spill / emergency response reference
- Goods identified against current source documents
- Packaging, markings and damage inspected
- Incompatible goods and ignition sources segregated
- Authorized handlers and suitable equipment confirmed
- Spill containment and emergency information accessible
- Transport and site-specific requirements reviewed
Battery charging & handling
Capture: Charging station reference · Battery chemistry / model · Compatible charger reference · Ventilation / fire assessment reference · Damaged battery quarantine arrangement · Electrolyte / thermal incident response
- Battery and charger compatibility confirmed
- Cables, connectors and handling equipment inspected
- Ventilation and ignition controls suit the battery chemistry
- Damaged batteries isolated from normal charging
- Trained response and emergency equipment available
- Access and post-charge release checks recorded
Driver fitness & rest planning
Capture: Journey / roster reference · Planned duty (hours) · Planned driving (hours) · Rest breaks and relief arrangement · Driver readiness check reference (no medical details) · Delay / fatigue escalation contact
- Duty and rest plan checked against approved transport policy
- Driver can report unfitness without pressure to depart
- Route and delivery windows allow planned breaks
- Relief, safe stopping and check-in arrangements confirmed
- Delay and fatigue escalation briefed
- Dispatch acceptance and exceptions recorded
Education & Research
Laboratory activity readiness
Capture: Laboratory reference · Experiment / activity · Academic / laboratory supervisor · Approved experiment protocol · Participants
- Experiment risk assessment and supervision reviewed
- Chemical / biological controls identified
- Equipment, ventilation and emergency equipment checked
- Participants briefed and waste route confirmed
Teaching workshop
Capture: Workshop reference · Machines / equipment · Class / training group · Supervision arrangement · Machine pre-use check reference
- Instructor and participant competency reviewed
- Guards, tools and isolation arrangements checked
- Supervision ratios and access controlled
- Emergency stops and first aid available
Fieldwork & educational visit
Capture: Destination / route · Participants · Trip leader · Check-in and escalation plan · Transport readiness reference
- Travel and destination risks reviewed
- Supervision and participant briefing complete
- Weather, accessibility and welfare considered
- Emergency contacts and check-in plan agreed
Campus event
Capture: Event reference · Venue · Expected attendance · Venue capacity approval · Event emergency plan
- Capacity, access and crowd flow checked
- Temporary electrical and structures reviewed
- Contractors and food vendors coordinated
- Emergency and welfare arrangements confirmed
Research chemical review
Capture: Research project reference · Inventory / SDS reference · Institutional review reference · Storage and compatibility plan · Waste route reference
- Hazards, quantities and compatibility reviewed
- Storage, ventilation and exposure controls checked
- Authorized researchers and training verified
- Waste, spill and emergency plans agreed
Residence & campus facilities
Capture: Residence / building · Occupancy group · Inspection reference · Evacuation / drill reference · Maintenance defect reference
- Fire exits, alarms and assembly routes checked
- Electrical, housekeeping and access hazards reviewed
- Resident reporting and emergency contacts visible
- Maintenance defects and follow-up assigned
Biological research & containment
Capture: Institutional protocol reference · Biological material / risk assessment reference · Approved containment and cabinet reference · Institutional biosafety authorization · Validated decontamination / waste route · Exposure response procedure reference
- Institutional assessment and authorization verified
- Containment matches the approved protocol
- Cabinet / equipment source certificates reviewed
- Access, training and supervision confirmed
- Decontamination and waste arrangements verified
- Exposure and emergency escalation briefed
Laser & radiation work review
Capture: Equipment / source reference · Source classification · Responsible specialist authorization · Controlled zone / access arrangements · Shielding / interlock assessment reference · Required monitoring and source licence reference
- Source classification and applicability reviewed by specialist
- Controlled access, signs and supervision in place
- Shielding and protective devices verified
- Training and source authorization verified
- Monitoring and emergency arrangements confirmed
- Equipment and licence evidence linked to source records
Research after-hours & lone work
Capture: Research / task reference · Requested access window · Authorizing supervisor · Buddy / supervision arrangement · Check-in frequency and missed-contact response · Prohibited or restricted tasks
- Task suitability for out-of-hours work assessed
- Source after-hours authorization checked where required
- Restricted tasks and supervision limits briefed
- Security access and emergency contacts confirmed
- Missed check-in escalation has an accountable responder
- End-of-work check-out and equipment safe state arranged
Hospitality, Tourism & Food Services
Guest & public area safety
Capture: Guest / public area · Expected occupancy · Inspection reference · Guest access / accessibility controls · Linked defect reference
- Slip, trip and access hazards checked
- Fire exits and emergency information checked
- Guest accessibility and public interfaces reviewed
- Defects isolated and response owner assigned
Kitchen workplace safety
Capture: Kitchen / outlet · Service period · Gas / cooking equipment · Extraction / suppression check reference · Hot oil handling controls
- Gas, electrical and fire controls checked
- Hot surfaces, knives and machinery controlled
- Floors, ventilation and manual handling checked
- Cleaning chemicals and emergency response reviewed
Housekeeping & laundry
Capture: Work area · Cleaning chemical / SDS reference · Shift · Chemical dilution procedure · Linen / waste handling controls
- Chemical dilution and incompatible products reviewed
- Manual handling and repetitive work controlled
- Sharps, waste and linen handling reviewed
- Wet-floor signage and equipment checked
Pool & spa safety
Capture: Pool / spa reference · Supervision / rescue plan · Water test record reference · Site-approved operating limits · Rescue readiness check reference
- Supervision and rescue equipment checked
- Water testing and plant condition reviewed
- Chemical storage and dosing controls checked
- Access, slips and emergency response reviewed
Banquet & event setup
Capture: Event reference · Venue · Expected attendance · Event layout reference · Vendor / contractor interfaces
- Capacity and evacuation routes checked
- Temporary structures and electrical work reviewed
- Manual handling and contractor interfaces controlled
- Public access and emergency arrangements agreed
Occupied-site maintenance
Capture: Maintenance work reference · Guest / public interface · Isolation / service interruption plan · Guest / occupier notification reference · Safe handback criteria
- Work boundaries and guest segregation confirmed
- Competency, tools and risk assessment checked
- Isolation and hot-work controls coordinated
- Reinstatement and handover checks assigned
An active linked PTW is required before this activity starts.
Food handling & hygiene checkpoints
Capture: Outlet / food process · Batch / service reference · Process control point · Approved limit and procedure reference · Measured result, unit and time · Deviation response and product disposition
- Site-approved handling procedure and limits identified
- Supplier / batch traceability and condition checked
- Cross-contamination and allergen controls reviewed
- Measuring instrument suitability and hygiene checked
- Deviation handled against approved procedure
- Responsible release and follow-up evidence recorded
Water system hygiene review
Capture: Water system / outlet reference · Competent water-risk assessment reference · Sampling / monitoring point · Approved control limits and method · Result / laboratory report reference · Flushing, isolation or corrective response
- System risk assessment and responsible person confirmed
- Monitoring scope and site-approved limits verified
- Stagnation and vulnerable outlets reviewed
- Sampling and instrument records retained
- Out-of-range findings escalated to competent review
- Corrective action and return-to-service acceptance recorded
Recreation & excursion safety
Capture: Recreation / excursion reference · Operator / guide reference · Expected participants · Approved weather / operating limits · Rescue and communication plan · Safety equipment inspection reference
- Activity risks, participant needs and operating limits reviewed
- Guide competency and supervision arrangements checked
- Safety equipment inspected and suitable
- Weather and stop / cancellation criteria briefed
- Communication, rescue and emergency access tested
- Participant briefing and final acceptance recorded
Industry submenus
Each operation submenu has its own record types, fields, readiness checks, source links and scoped register. Add on an activity card selects that form. Detail and Edit open modal popups. The overview counts records within your unit access; changing submenu clears unrelated activity and status filters.
Construction & Infrastructure
- Electrical, hot work & confined space — Coordinate isolation, testing, rescue and commissioning with source work controls.
- Chemicals & exposure — Manage construction chemical tasks using the existing chemical inventory and exposure controls.
- Projects & handover — Coordinate project phases, site boundaries, principal contractors and residual risks at handover.
- Lifting operations — Review lift plans, load data, crane setup, lifting teams and exclusion zones.
- Scaffolds & temporary works — Track scaffold handover, design checks, formwork loading and concrete pour readiness.
- Excavation & demolition — Control underground services, ground stability, demolition sequence and public interfaces.
- Work at height — Record access methods, fall protection and task-specific rescue arrangements.
- Traffic & public protection — Manage deliveries, road interfaces, pedestrian segregation and temporary diversions.
Manufacturing & Engineering
- Production & machine guarding — Review shifts, line readiness, machine guards and interlock test evidence.
- Engineering & process changes — Document change scope, revised safeguards and acceptance before release.
- Maintenance & pressure systems — Coordinate isolation, stored energy, pressure equipment examination and restoration.
- Chemicals & combustible dust — Review chemical compatibility, dust-generating processes, extraction and ignition controls.
- Exposure & occupational hygiene — Coordinate workgroups, exposure assessment and follow-up against source health records.
- Shutdown & restart — Reconcile shutdown work, isolation boundaries and pre-start acceptance.
Oil, Gas & Petrochemicals
- Process areas & PSSR — Review operating envelopes, handovers and pre-startup readiness for new or modified systems.
- SIMOPS coordination — Resolve interacting tasks, area authority interfaces and conflicting work windows.
- Process isolation — Plan system boundaries, verification and controlled reinstatement through source LOTO and PTW.
- Turnaround & shutdown — Coordinate contractor interfaces, critical work and commissioning evidence.
- Transfer & containment — Review transfer connections and loss-of-containment follow-up with source events and CAPA.
- Safety barriers & impairments — Track safeguard test references, impairments, compensating controls and restoration reviews.
Logistics, Warehousing & Distribution
- Loading bays & dispatch — Check dock interfaces, restraints, driver briefing and release readiness.
- MHE, traffic & charging — Coordinate forklift zones, pedestrian routes and battery charging hazards.
- Racking & dangerous goods — Review rack condition, loading limits and dangerous-goods segregation and handling.
- Cold storage & refrigeration — Record temperatures, entrapment controls, refrigerant hazards and cold exposure arrangements.
- Journeys & driver readiness — Plan routes, driving and rest schedules, check-ins and delivery-site risks.
- Warehouse inspections — Follow warehouse housekeeping, access, fire protection and assigned findings.
Education & Research
- Laboratories, biosafety & radiation — Review experiment hazards, containment, specialist authorization and controlled laboratory access.
- Teaching workshops — Record class groups, instructor supervision and safe use of teaching machines.
- Fieldwork & educational visits — Plan participants, route risks, welfare, check-ins and emergency contacts.
- Campus events — Coordinate venue capacity, temporary installations, vendors and crowd arrangements.
- Research & after-hours work — Review research materials and supervision, lone-working and out-of-hours escalation.
- Residences & campus buildings — Coordinate resident safety checks and maintenance with the Facilities workspace.
Hospitality, Tourism & Food Services
- Guest & public areas — Manage public access, occupancy, slip hazards and guest-area defect follow-up.
- Kitchens & food hygiene — Review kitchen hazards and food handling checkpoints using site-approved limits.
- Housekeeping & laundry — Control chemicals, linen handling, repetitive work and safe room turnaround.
- Pools, water hygiene & recreation — Coordinate pool supervision, water-system reviews, leisure activity checks and rescue plans.
- Banquets & events — Review guest capacity, event layout, temporary structures and vendor interfaces.
- Occupied-site maintenance — Plan service interruptions and segregate work from guests before controlled handback.
Shared assets, certificates and calendar
Assets & equipment shows the authoritative Equipment records tagged for this industry. Add, Edit, Detail, certificates and approvals use the same Equipment workspace. Select industry views on its form or link an asset from an activity. Certificates & compliance summarizes source certificates and legal obligations linked to accessible industry activities; it does not create copies.
Use Calendar & recurring work to filter due dates for the week or month. Recurrence creates a new draft after a prior activity closes; complete fresh checks and independent approvals. Approved site procedures supply technical limits and acceptance criteria. These operational templates do not issue statutory licences or replace source permits.
Construction workflow
Use the grouped menu above the hero. Planning contains projects, activities and calendar; Risk & permits contains CDM, HIRARC and work authorization; Resources contains equipment and readiness; Operations contains construction work categories. Monitoring & response, Assurance & reports, and Help & workspaces contain the related follow-up modules. Select the down arrow to open a group. Project context follows construction submenu links.
- Create a project and work zones. Select existing GIS locations and, if applicable, the existing SHASSIC project. Keep the organization unit aligned with its HSE source records.
- Prepare pre-construction information, the construction phase plan and dutyholder coordination in CDM. Attach clean evidence, submit for review and obtain independent acceptance before activating the project.
- Add the appropriate construction activity. In Projects & zones, link the draft activity to its project and zone. Open its Source controls to link the authoritative HIRARC, Work Package, JSA, PTW, inspection and CAPA records.
- Use the existing HIRARC, JSA and PTW workflows for risk assessment, control verification and work authorization. Open SHASSIC under Assurance & reports for construction safety and health assessment; link the existing SHASSIC project from Projects & zones where applicable.
- Use the existing Work Package for internal, contractor or mixed teams. Existing PTW checks still enforce JSA, competency, equipment, isolation, gas tests, site verification and toolbox acknowledgement as applicable. Construction checks are additional requirements.
- Record material changes or incidents as a Change / incident reassessment item and link the source event, MOC or CAPA. Resolve the review and reverify changed risk controls before progressing work. Use the existing stop-work / suspension controls for work already in progress.
- Review KPI cards, source links, workflow charts and GIS. Enter actual monthly exposure hours and reconciled case totals; an independent reviewer verifies them. Incomplete project-months show unavailable rates, never an assumed zero.
- Close source work, permits and CAPA, accept the safety & health file and then complete the project. Accepted documents retain their revision history.
The activity checklist does not replace competent technical assessment, approved work methods or statutory submissions. BIM, hardware telemetry and AI vision are not connected by this release.
Search this category by module, function, role or example scenario.
INDUSTRIES
Industry workspaces
Prepare industry-specific activities, review readiness, link controlled HSE records and independently verify closure.
01 INDUSTRIESConstruction & InfrastructureIndustry activity and readiness records connected to existing HSE modules.
What you can do
- Project & site readiness: Project reference, Principal contractor, Construction phase, Site layout / emergency plan, Next site review.
- Lifting operation review: Lift plan reference, Load (tonnes), Crane / lifting equipment reference, Planned lift radius (m), Ground bearing verification.
- Scaffold & temporary works: Design / scaffold reference, Working height (m), Inspection / handover reference, Handover date, Design load class.
- Excavation readiness: Excavation area / drawing, Planned depth (m), Underground utility survey, Ground support / batter method, Inspection frequency and triggers.
- Work at height: Task / method statement, Working height (m), Rescue plan reference, Access method, Anchor / collective protection reference.
- Site handover & assurance: Handover reference, Handover boundary, Receiving party, Residual risks and limitations, Outstanding defects reference.
- Demolition & structural alteration: Structure / survey reference, Engineered demolition sequence, Utility disconnection reference, Hazardous material survey and disposition, Exclusion boundary and public protection, Structural stability review reference.
- Site traffic & public interface: Traffic management plan reference, Delivery / diversion window, Vehicle route and reversing locations, Protected pedestrian route, Traffic controller / banksman, Road authority consent reference or applicability reason.
- Formwork & concrete pour release: Pour / structural element reference, Formwork and falsework design reference, Planned volume (m³), Pour sequence and rate control, Pre-pour inspection reference, Responsible release authority.
- Scaffolding erection & handover: Scaffold design / configuration, Loading class and access, Inspection / handover tag reference.
- Electrical installation & isolation: Circuit / supply boundary, Isolation and test reference, Authorized electrical person.
- Hot work & fire prevention: Method and work boundary, Fire watch and post-work watch, Combustible removal / protection.
- Confined space entry: Space register / classification reference, Authorized entry team and standby person, Site-specific rescue plan reference.
- Heavy plant & machinery movement: Equipment and operator references, Ground bearing / travel route, Spotter and exclusion plan.
- Roofing & facade installation: Fragile roof / open edge plan, Access equipment / anchorage reference, Approved weather and wind limits.
- MEP installation & commissioning: System and commissioning boundary, Pressure / functional test method, Trade interfaces and energization plan.
- Construction chemicals & exposure: Chemical inventory / SDS reference, Exposure routes and persons at risk, Storage, spill and waste arrangements.
- Complete all readiness checks, attach supporting evidence, and request an independent review.
- Start within the approved date window; permit-required work needs a linked active PTW.
- Record completion, resolve linked PTW and CAPA, then obtain independent closure.
- Use scoped CSV / PDF exports, Action Inbox, repeat schedules and in-app reminders.
Authorized role examples
Organization Administrator, Industry Coordinator, Activity Owner and Independent Reviewer. Roles must be active and scoped to the relevant organization unit.
Example scenario
Example: A site needs to industry activity and readiness records connected to existing HSE modules The authorized user opens Construction & Infrastructure, completes the controlled record and follows the required workflow.
/workspace/industries/construction- Open Industry workspaces and choose an enabled industry.
- Choose Register, select Add activity, and complete the labelled popup form.
- Use Detail for readiness checks, evidence, source links and permitted workflow actions.
Hard delete is never the normal lifecycle for a controlled record. Once used, submitted, approved, linked, printed or evidenced, use amendment, revision, void, retirement, archive or supersede with a reason.
02 INDUSTRIESManufacturing & EngineeringIndustry activity and readiness records connected to existing HSE modules.
What you can do
- Production line readiness: Line / process reference, Product family, Operating shift, Pre-start checklist reference, Operators in shift.
- Machine / process change: Machine reference, Change control reference, Change scope, Trial and acceptance results, Source MOC reference.
- Maintenance & isolation: Asset reference, Isolation / LOTO reference, Energy sources, Zero-energy verification method, Restoration owner.
- Chemical process handling: Process reference, Chemical inventory / SDS reference, Exposure assessment reference, Containment / ventilation reference, Waste disposal route.
- Occupational hygiene review: Exposure being reviewed, Exposed workgroup, Assessment / monitoring reference, Monitoring date, Control follow-up.
- Factory shutdown / restart: Shutdown reference, Plant / line boundary, Restart authority, Pre-start review reference, Outstanding restart restrictions.
- Machine guarding & interlock review: Equipment reference, Dangerous movement / access zone, Guard / protective device type, Approved test procedure reference, Test outcome and defects, Isolation or authorized release reference.
- Pressure system examination review: Pressure equipment reference, Design pressure (bar), Operating pressure (bar), Competent examination / certificate reference, Relief device and test reference, Next review date.
- Combustible dust control review: Dust-producing material, Process / extraction system reference, Dust hazard assessment reference, Ignition sources and controls, Approved housekeeping method, Explosion protection / isolation design reference.
- Complete all readiness checks, attach supporting evidence, and request an independent review.
- Start within the approved date window; permit-required work needs a linked active PTW.
- Record completion, resolve linked PTW and CAPA, then obtain independent closure.
- Use scoped CSV / PDF exports, Action Inbox, repeat schedules and in-app reminders.
Authorized role examples
Organization Administrator, Industry Coordinator, Activity Owner and Independent Reviewer. Roles must be active and scoped to the relevant organization unit.
Example scenario
Example: A site needs to industry activity and readiness records connected to existing HSE modules The authorized user opens Manufacturing & Engineering, completes the controlled record and follows the required workflow.
/workspace/industries/manufacturing- Open Industry workspaces and choose an enabled industry.
- Choose Register, select Add activity, and complete the labelled popup form.
- Use Detail for readiness checks, evidence, source links and permitted workflow actions.
Hard delete is never the normal lifecycle for a controlled record. Once used, submitted, approved, linked, printed or evidenced, use amendment, revision, void, retirement, archive or supersede with a reason.
03 INDUSTRIESOil, Gas & PetrochemicalsIndustry activity and readiness records connected to existing HSE modules.
What you can do
- Process area readiness: Process area / unit, Operating mode, Shift handover reference, Operating envelope reference, Outstanding shift actions.
- SIMOPS coordination: SIMOPS matrix reference, Interacting activities, Area authority, Conflicts and agreed sequencing, Coordination meeting reference.
- Process isolation review: Isolation certificate / plan, System boundary, Verification method, Blind / isolation point list, Reinstatement sequence.
- Turnaround / shutdown readiness: Turnaround reference, Scope boundary, Contractor interfaces, Commissioning / restart reference, Critical path interfaces.
- Product transfer operation: Product / SDS reference, Transfer route / connection, Receiving system, Receiving capacity verification, Emergency shutdown test reference.
- Safety barrier assurance: Barrier / safeguard reference, Performance standard reference, Impairment / test reference, Next planned test, Open impairments.
- Pre-startup safety review (PSSR): New / modified system reference, Source MOC / project reference, Design and construction acceptance reference, Outstanding actions and startup restrictions, Operating / emergency procedure revisions, Accountable startup authority.
- Barrier impairment & restoration: Safety-critical barrier reference, Impairment and affected scenarios, Compensating controls and monitoring, Temporary impairment authorization reference, Restoration review date, Restoration test / acceptance reference.
- Loss-of-containment follow-up: Source event reference, Equipment / line reference, Released material, Isolation and containment response, Environmental monitoring / notification reference, Repair and reinstatement review reference.
- Complete all readiness checks, attach supporting evidence, and request an independent review.
- Start within the approved date window; permit-required work needs a linked active PTW.
- Record completion, resolve linked PTW and CAPA, then obtain independent closure.
- Use scoped CSV / PDF exports, Action Inbox, repeat schedules and in-app reminders.
Authorized role examples
Organization Administrator, Industry Coordinator, Activity Owner and Independent Reviewer. Roles must be active and scoped to the relevant organization unit.
Example scenario
Example: A site needs to industry activity and readiness records connected to existing HSE modules The authorized user opens Oil, Gas & Petrochemicals, completes the controlled record and follows the required workflow.
/workspace/industries/oil_gas- Open Industry workspaces and choose an enabled industry.
- Choose Register, select Add activity, and complete the labelled popup form.
- Use Detail for readiness checks, evidence, source links and permitted workflow actions.
Hard delete is never the normal lifecycle for a controlled record. Once used, submitted, approved, linked, printed or evidenced, use amendment, revision, void, retirement, archive or supersede with a reason.
04 INDUSTRIESLogistics, Warehousing & DistributionIndustry activity and readiness records connected to existing HSE modules.
What you can do
- Loading bay & dispatch: Bay reference, Load type, Vehicle / trailer reference, Restraint / load check reference, Dispatch authority.
- Forklift & traffic zone: Traffic zone, Forklift / truck reference, Operator competency reference, Pedestrian segregation controls, Pre-use check reference.
- Racking & storage inspection: Rack / aisle reference, Displayed safe load (kg), Inspection reference, Damage / isolation reference, Next inspection.
- Cold storage work safety: Cold room reference, Operating temperature (°C), Refrigerant / SDS reference, Entrapment alarm test reference, Cold exposure work / rest plan.
- Journey & delivery risk: Route / destination, Vehicle reference, Planned journey (hours), Check-in and safe-stop plan, Load / restraint check reference.
- Warehouse safety walk: Inspection zone, Shift, Walk / checklist reference, Findings and immediate controls, Source CAPA reference.
- Dangerous goods handling & segregation: Consignment / storage reference, Dangerous goods classification / UN reference, Quantity and unit, Compatibility and segregation plan, Packaging / transport document reference, Spill / emergency response reference.
- Battery charging & handling: Charging station reference, Battery chemistry / model, Compatible charger reference, Ventilation / fire assessment reference, Damaged battery quarantine arrangement, Electrolyte / thermal incident response.
- Driver fitness & rest planning: Journey / roster reference, Planned duty (hours), Planned driving (hours), Rest breaks and relief arrangement, Driver readiness check reference (no medical details), Delay / fatigue escalation contact.
- Complete all readiness checks, attach supporting evidence, and request an independent review.
- Start within the approved date window; permit-required work needs a linked active PTW.
- Record completion, resolve linked PTW and CAPA, then obtain independent closure.
- Use scoped CSV / PDF exports, Action Inbox, repeat schedules and in-app reminders.
Authorized role examples
Organization Administrator, Industry Coordinator, Activity Owner and Independent Reviewer. Roles must be active and scoped to the relevant organization unit.
Example scenario
Example: A site needs to industry activity and readiness records connected to existing HSE modules The authorized user opens Logistics, Warehousing & Distribution, completes the controlled record and follows the required workflow.
/workspace/industries/logistics- Open Industry workspaces and choose an enabled industry.
- Choose Register, select Add activity, and complete the labelled popup form.
- Use Detail for readiness checks, evidence, source links and permitted workflow actions.
Hard delete is never the normal lifecycle for a controlled record. Once used, submitted, approved, linked, printed or evidenced, use amendment, revision, void, retirement, archive or supersede with a reason.
05 INDUSTRIESEducation & ResearchIndustry activity and readiness records connected to existing HSE modules.
What you can do
- Laboratory activity readiness: Laboratory reference, Experiment / activity, Academic / laboratory supervisor, Approved experiment protocol, Participants.
- Teaching workshop: Workshop reference, Machines / equipment, Class / training group, Supervision arrangement, Machine pre-use check reference.
- Fieldwork & educational visit: Destination / route, Participants, Trip leader, Check-in and escalation plan, Transport readiness reference.
- Campus event: Event reference, Venue, Expected attendance, Venue capacity approval, Event emergency plan.
- Research chemical review: Research project reference, Inventory / SDS reference, Institutional review reference, Storage and compatibility plan, Waste route reference.
- Residence & campus facilities: Residence / building, Occupancy group, Inspection reference, Evacuation / drill reference, Maintenance defect reference.
- Biological research & containment: Institutional protocol reference, Biological material / risk assessment reference, Approved containment and cabinet reference, Institutional biosafety authorization, Validated decontamination / waste route, Exposure response procedure reference.
- Laser & radiation work review: Equipment / source reference, Source classification, Responsible specialist authorization, Controlled zone / access arrangements, Shielding / interlock assessment reference, Required monitoring and source licence reference.
- Research after-hours & lone work: Research / task reference, Requested access window, Authorizing supervisor, Buddy / supervision arrangement, Check-in frequency and missed-contact response, Prohibited or restricted tasks.
- Complete all readiness checks, attach supporting evidence, and request an independent review.
- Start within the approved date window; permit-required work needs a linked active PTW.
- Record completion, resolve linked PTW and CAPA, then obtain independent closure.
- Use scoped CSV / PDF exports, Action Inbox, repeat schedules and in-app reminders.
Authorized role examples
Organization Administrator, Industry Coordinator, Activity Owner and Independent Reviewer. Roles must be active and scoped to the relevant organization unit.
Example scenario
Example: A site needs to industry activity and readiness records connected to existing HSE modules The authorized user opens Education & Research, completes the controlled record and follows the required workflow.
/workspace/industries/education- Open Industry workspaces and choose an enabled industry.
- Choose Register, select Add activity, and complete the labelled popup form.
- Use Detail for readiness checks, evidence, source links and permitted workflow actions.
Hard delete is never the normal lifecycle for a controlled record. Once used, submitted, approved, linked, printed or evidenced, use amendment, revision, void, retirement, archive or supersede with a reason.
06 INDUSTRIESHospitality, Tourism & Food ServicesIndustry activity and readiness records connected to existing HSE modules.
What you can do
- Guest & public area safety: Guest / public area, Expected occupancy, Inspection reference, Guest access / accessibility controls, Linked defect reference.
- Kitchen workplace safety: Kitchen / outlet, Service period, Gas / cooking equipment, Extraction / suppression check reference, Hot oil handling controls.
- Housekeeping & laundry: Work area, Cleaning chemical / SDS reference, Shift, Chemical dilution procedure, Linen / waste handling controls.
- Pool & spa safety: Pool / spa reference, Supervision / rescue plan, Water test record reference, Site-approved operating limits, Rescue readiness check reference.
- Banquet & event setup: Event reference, Venue, Expected attendance, Event layout reference, Vendor / contractor interfaces.
- Occupied-site maintenance: Maintenance work reference, Guest / public interface, Isolation / service interruption plan, Guest / occupier notification reference, Safe handback criteria.
- Food handling & hygiene checkpoints: Outlet / food process, Batch / service reference, Process control point, Approved limit and procedure reference, Measured result, unit and time, Deviation response and product disposition.
- Water system hygiene review: Water system / outlet reference, Competent water-risk assessment reference, Sampling / monitoring point, Approved control limits and method, Result / laboratory report reference, Flushing, isolation or corrective response.
- Recreation & excursion safety: Recreation / excursion reference, Operator / guide reference, Expected participants, Approved weather / operating limits, Rescue and communication plan, Safety equipment inspection reference.
- Complete all readiness checks, attach supporting evidence, and request an independent review.
- Start within the approved date window; permit-required work needs a linked active PTW.
- Record completion, resolve linked PTW and CAPA, then obtain independent closure.
- Use scoped CSV / PDF exports, Action Inbox, repeat schedules and in-app reminders.
Authorized role examples
Organization Administrator, Industry Coordinator, Activity Owner and Independent Reviewer. Roles must be active and scoped to the relevant organization unit.
Example scenario
Example: A site needs to industry activity and readiness records connected to existing HSE modules The authorized user opens Hospitality, Tourism & Food Services, completes the controlled record and follows the required workflow.
/workspace/industries/hospitality- Open Industry workspaces and choose an enabled industry.
- Choose Register, select Add activity, and complete the labelled popup form.
- Use Detail for readiness checks, evidence, source links and permitted workflow actions.
Hard delete is never the normal lifecycle for a controlled record. Once used, submitted, approved, linked, printed or evidenced, use amendment, revision, void, retirement, archive or supersede with a reason.
No module or function matches this search. Try a role, module name or action such as “print”, “evidence” or “CAPA”.
COMMON CONTROL PATTERN
Use the right workspace for the next action
NEED HELP?
Share the record reference, workspace URL and displayed error reference.
Do not include restricted medical, identity or personal data in a support request.